top of page
IMG_0811.heic
A1A04672.JPG

Christopher Briggs

Golf Course Superintendent
The Bridge Golf Club

 

Email:

chrisbriggs03@gmail.com

​

​
​

Hello! I'm Chris

 

I'm 38 years old, I have been maintaining Golf Courses at a high agronomic level in the Metro and Eastern Long Island area for the past fourteen years. I have a vast array of construction experience that ranges from USGA greens construction, Bunker renovations with multiple types of liner installations, Irrigation installs with Rainbird and Toro, and multiple drainage projects on all playing surfaces.

WORK EXPERIENCE
EXPERIENCE
Reconstruction Photos
EDUCATION
2024-Present

Golf Course Superintednent

2023-2024

Golf Course Superintednent

The Bridge Golf Club

Currently I am managing a crew of 55 with the daily goal of achieving the highest quality of playing conditions during  our peak season. We strive daily to have a level of detail that seperates us from most clubs in the nation.

Gardiners Bay Country Club

In my short time as Superintendent, We installed XGD drainage on 10 greens, Installed a new 2 wire Toro system, constructed two bunkers using Bunker Solutions liner and constructed multiple cartpaths. This is a unique property with no fairway irrigation and an allowance of 6 Million Gallons per year. 

2021-2023

Golf Course Superintendent

2013-2021
Senior Assistant Superintendent
Intern- Summer of 2010

Marine Park Golf Course

My two seasons as Golf Course Superintendent at Marine Park was a different change of pace coming from a high end private membership club to a single owner public golf course. At Marine Park I completed the construction of new tees and  mounding to separate  hole along with multiple drainage products all while providing optimal conditions with an average of 45,000 golf rounds per year.

Noyac Golf Club

I was the Senior Assistant now for seven years at Noyac Golf Club, a private parkland golf club nestled on the east end of Long Island. In my term I have aided the course in a full tee and greens renovation to USGA standards profile along with Billy Bunker on all the complexes bunkers. Along with this renovation I have worked wth XGD drainage on the  installation of wall to wall drainage on tees, fairways and approaches. 

The images below are examples of the different types of golf course construction that I have been envolved in.

This includes XGD drainage in greens, tees and fairways. USGA greens construction along with tee construction to USGA specs. Bunker renovations using two types of bunker liners; Better Billy Bunker and Bunker Solutions.  Installation of a new irrigation system (Toro 2- Wire with HDPE pipe) along with a refurbishment of a Rainbird 2 -wire system during a reconstruction project.

Education
  • State University of New York at Cobleskill

    • Bachelors in Turfgrass and Golf Course Management
    • Graduated in May 2013 ​

  • NYS Licensed Commerical Pesticide Applicator

  • GCSAA Class A Superintendent

  • 2020 Toro Assistant Experience Attendee 

  • 2019 Greenstart Academy Attendee

Education
SKILLS
SKILLS

Microsoft ExCel - Advanced

Microsoft Word - Advanced

Power Point - Proficient

Adobe - Proficient

Spanish - Advanced

Tournament Experience
EXPERTISE
  • 2019 LPGA LA Open

  • 2018 Men's U.S. Open

  • 2013 Women's U.S. Open

  • 2013 MET Open Qualifier 

  • 2010 MET P.G.A Team Championship

  • 2010 U.S. Open Local Qualifier 

CONTACT
CONTACT ME

Christopher Briggs

Golf Course Superintendent

The Bridge Golf Club

Phone:

631-566-8797

 

Email:

chrisbriggs03@gmail.com 

​

    Success! Message received.

    © 2023 By Rachel Smith. Proudly created with Wix.com

    bottom of page